[17 September 2017] Cost of Bullet Train project: 1.1 lakh crore rupees
Source: https://en.wikipedia.org/wiki/Mumbai%E2%80%93Ahmedabad_high-speed_rail_corridor#Cost
Cost of 2G Scam: 1.7 lakh crore rupees
Source: https://archive.is/PCBhg
Cost of Coalgat scam: Rs 10.7 lakh crore, "later toned this amount down to Rs 1.86 lakh crore"
Source: https://archive.is/SfcFR
Critical question: Is the amount of randirona on Reddit the same for all 3?
Original post by user anon89890 on indianews.reddit.com
Source: https://en.wikipedia.org/wiki/Mumbai%E2%80%93Ahmedabad_high-speed_rail_corridor#Cost
The project is estimated to cost ₹1.1 lakh crore (US$17 billion).[33] The cost includes interest during construction and import duties.[34]
Cost of 2G Scam: 1.7 lakh crore rupees
Source: https://archive.is/PCBhg
The shortfall between the money collected and the money which the law mandated to be collected is estimated to be Rs.1,76,645 crore, as valued by the Comptroller and Auditor General of India based on 3G and BWA spectrum auction prices in 2010.
Cost of Coalgat scam: Rs 10.7 lakh crore, "later toned this amount down to Rs 1.86 lakh crore"
Source: https://archive.is/SfcFR
A report by the Comptroller and Auditor General of India showed inefficient and possibly illegal allocation of coal blocks between 2004 and 2009. It estimated loss to the exchequer to the tune of Rs 10.7 lakh crore but it later toned this amount down to Rs 1.86 lakh crore in the final report.
Critical question: Is the amount of randirona on Reddit the same for all 3?
Original post by user anon89890 on indianews.reddit.com
0 comments:
Post a Comment